Thread
:
72 TA : New Project
View Single Post
#
1
12-30-2010, 08:31 PM
njsteve
Yenko Contributing Member
Join Date: Nov 2003
Location: NJUSA
Posts: 8,378
Thanks: 8
Thanked 2,789 Times in 855 Posts
Re: 72 TA : New Project
I did the preliminary mounting of the base plate ring. I carefully drilled the holes in sets of two at a time, and then secured the plate to the shaker with 13 small nuts and bolts that are the same diameter as the rivets in order to get everything fixed in place and mated up properly.
njsteve
View Public Profile
Find all posts by njsteve