View Single Post
  #1  
Old 12-30-2010, 08:31 PM
njsteve's Avatar
njsteve njsteve is offline
Yenko Contributing Member
 
Join Date: Nov 2003
Location: NJUSA
Posts: 8,376
Thanks: 8
Thanked 2,779 Times in 852 Posts
Default Re: 72 TA : New Project

I did the preliminary mounting of the base plate ring. I carefully drilled the holes in sets of two at a time, and then secured the plate to the shaker with 13 small nuts and bolts that are the same diameter as the rivets in order to get everything fixed in place and mated up properly.






Reply With Quote