Finally, in October, the new floor was poured. Took a lot of prep to get it here.

Pretty darn level for being a fairly large area without being able to drive pins. I specified no pins, as they would compromise the vapor barrier. New floor is 45 wide, 25 deep.

It is very level for 20 feet, then a gentle 5 foot slope to the existing floor on the lower level. Space for the gantry crane, welders, sandblast cabinet, grinder, etc. Even have room to park a couple of cars well out of the work area. That way, if I run into a snag on one car, I can roll it over to the side, and still use the lift and flats on other projects.

Still needed to contend with that big 6 foot by 6 foot square hole in the floor with a well in it.
Attached Images
    
__________________
Don't believe everything you read on the internet ... Ben Franklin
Reply With Quote
The Following 2 Users Say Thank You to Lynn For This Useful Post:
PeteLeathersac (01-20-2020), scuncio (02-04-2020)