Thread
:
69 Z/28 Day II Project (Air Force Brat)
View Single Post
#
1
06-06-2021, 08:40 PM
NorCam
Senior Member
Join Date: Feb 2015
Location: Alberta, Canada
Posts: 4,237
Thanks: 2,748
Thanked 3,592 Times in 1,282 Posts
Figured I better finish installing the square Lakewood's with the 4* wedges before installing the driveshaft. The spring bolts are 3/8" too short to go through the wedges with a longer nut so I'm going to get new spring bolts tomorrow and add longer nuts to center it down through the rubber isolators and into the holes in the mounting plates. Once I get these buttoned-up I can install the driveshaft and the loop. One little win at a time.
__________________
I like solid lifter cars, big cams and cars w/ 3 pedals in them.
The Following 3 Users Say Thank You to NorCam For This Useful Post:
dykstra
(06-07-2021),
HawkX66
(06-07-2021),
RPOLS3
(06-07-2021)
NorCam
View Public Profile
Find all posts by NorCam