View Single Post
  #6  
Old 12-08-2021, 02:26 AM
1972convss454 1972convss454 is offline
Yenko Contributing Member
 
Join Date: Nov 2010
Location: Tennessee
Posts: 191
Thanks: 262
Thanked 126 Times in 48 Posts
Default

In reference to the November 19th Leeds LS6, I have a BS for an L78 that was built a couple of days after at the Leeds plant. You would have thought that after they began producing the LS6 the L78 would have been out but I guess with the build dates so close there must have been overlap.

As far as a timeline, check this out. My car was ordered at the dealer on August 16th, 1969. The date on the Build Sheet is October 14th. Almost two months later. Then it was invoiced out October 23rd. The Lakewood plant to Sulligent, Al where the car was sold is less than 250 miles away.

I guess the point I am trying to make is it would make since that you would or could have some early December L78's based off of a two month lead time having a cut off of October 30th 1969 per the dealer memo introducing the LS6.
Attached Images
   
__________________
Joseph Farrow
1970 Chevelle L78
1970 Chevelle LS6
1972 Chevelle LS5

Last edited by 1972convss454; 12-08-2021 at 02:29 AM.
Reply With Quote
The Following 6 Users Say Thank You to 1972convss454 For This Useful Post:
69M22Z (12-08-2021), ls6owner (12-08-2021), olredalert (12-08-2021), SS427 (12-08-2021), tom406 (12-08-2021), tunes (12-08-2021)