View Single Post
  #78  
Old 03-17-2008, 12:52 AM
Bill Rose Bill Rose is offline
Yenko Contributing Member
 
Join Date: Sep 2004
Location: New Jersey
Posts: 944
Thanks: 18
Thanked 24 Times in 13 Posts
Default Re: New project coming along

ElCamino Update: With the chassis finished, it was time to start the body work. The car is remarkably rust free. Only a couple small patches on the roof, where the vinyl top was originally. The biggest repair is the left side, where it was hit in a slow speed crash (thanks Mark Sheppard for that info). The rocker and lower quarter was pushed in. Got an nos quarter (thanks Greg Cullium/Jim Henke) and a new rocker. It took several evenings, some cut up knuckles, a few takeout dinners, and a bunch of 4 letter words, but the rocker and quarter are out. I also rustproofed all the "innards". Then a buddy of mine helped me out welding the rocker. The quarter is fitted and ready for welding tomorrow. Also got a new used door, which is in perfect condition. I stripped the door and fitted all the parts and everything looks good. The it's off to the blaster. i will have the interior, firewall, bed, and the whole bottom of the body blasted. Thats where I am today. I'm gonna keep posting this stuff, till someone tells me to stop.

Welding the rocker:



Rocker, door, and quarter on:

__________________
69 El Camino
69 Nova
C7 Vette
Reply With Quote