We built a frame to hold a concrete retaining wall using ¾ inch plywood and a bunch of 2x4 stiff backs. After hand tamping a ton of 1 inch gravel in the bottom, I lined it with a boat load of 5/8 rebar. You can see some of the framework below, but I did not get a pic of the completed form. I ran a string line across and made certain it was dead level before forming. I had 2 x 4 and 2 x 6 struts running to 2 x 4 stakes. There was a strut every 16 inches.
We rented a pumper and pumped in 9.5 yards of concrete. The wall is 45 feet long, 18 inches thick, and about 24 inches high. If you do the math, you will see that doesn’t even come close to requiring 9.5 yards. Where did all the extra concrete go? We pumped it under the existing upper slab.
This job went really fast. Gotta love the pumper. Beat the hell out of wheeling it in.
That wall will be the base for a non load bearing wall between the upper and lower levels. Even though “J” bolts were not required for an interior non load bearing wall, I put a bunch in there. Upper level is just for storage. That way, I only need to heat the lower level. Getting that wall in was a real turning point for me. I was finally believing we could get this done.
I had one small area that bowed out maybe a half inch. No one notices but me.