Update........Got all the wiring except for the dash finished.......got the shift linkage and Dakota Digital Position Indicator finished.......Got the Power Steering hoses all installed........Got the Radiator and Heater hoses finished......All that's left to do is to get the Transmission cooling lines installed (Hopefully the correct fittings will show up today).......Now it's time to get inside and get the Dakota Digital dash installed.........Then off to the Exhaust shop.......The Engine compartment looks a lot better with all the wires gone........