Had to order an extra 50-foot line set and a coupler kit. So I have one unit on each end at 9 feet high. Air Handlers come with 25 footers. Aldo got a 75-foot control cable. I need to insulate all the line set joints. Maybe next week. Going to be in the single digits the next 3 or 4 days. Then I will finish zip tieing all the control cable etc. nice and sano. Now I can have heat in the shop while I finish some wiring and get ready to start moving things in. Can't wait for the picture of the 2 4-post lifts set-up and everything in place. Danny
|