Go Back   The Supercar Registry > General Discussion > Supercar/Musclecar Discussion


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 09-24-2020, 03:36 AM
rsinor rsinor is offline
Yenko Contributing Member
 
Join Date: Dec 2005
Location: Owasso, OK
Posts: 125
Thanks: 108
Thanked 63 Times in 19 Posts
Default

I suspect it is simply a scheduling problem with the trucking company at this point. Unfortunately these are strange times. My C8 deposit was placed over four years ago. The car a HTC was finally built today. I won’t see it until late October. It was three weeks from production when the plant shut down in late March. It’s frustrating but I know people who have not worked since March because their work requires Airline travel, times are indeed strange.
__________________
Roy Sinor
ENJOY LIFE NOW........IT DOES HAVE AN EXPIRATION DATE, SO......
LIVE WELL, LOVE MUCH, LAUGH OFTEN

Sinor Prestige Automobiles Inc.
9575 N 177th E. Ave.
Owasso, OK 74055
918-361-6424 cell
[email protected]
www.sinorprestigeauto.com

Last edited by rsinor; 09-24-2020 at 03:44 AM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 12:49 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.