Go Back   The Supercar Registry > General Discussion > Garages/shops..


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 03-31-2017, 03:21 AM
NorCam's Avatar
NorCam NorCam is offline
Senior Member
 
Join Date: Feb 2015
Location: Alberta, Canada
Posts: 4,237
Thanks: 2,748
Thanked 3,592 Times in 1,282 Posts
Default

Back to work on getting my work shop finished up and organized. After painting and doing my bench top, it was finally time to start plumbing some new air lines using 1/2" black pipe. Comes out of the compressor and feeds a regulated oil fed line (left) with one outlet by the counter top, and one up to a ceiling mounted hose reel that will go just above the back corner of the lift on Friday.

The other feed goes immediately up to the right of the compressor and tomorrow that line will go right across the top to the other side of the shop where it drops down to a clean trio of water traps with desiccant filter before going out to my paint room and sand blast cabinet. I have have three water drop traps for bleeding off any moisture and I hope to have it all finished by Friday night or Saturday AM.

Also ran another comms cable out yesterday and installed a shop phone to pickup my business lines so I can answer business calls when out working on my project cars. Gotta stay connected to keep business rolling along.

__________________
I like solid lifter cars, big cams and cars w/ 3 pedals in them.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 05:06 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.