Go Back   The Supercar Registry > General Discussion > Technical & Restoration


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 02-09-2019, 03:17 PM
NorCam's Avatar
NorCam NorCam is offline
Senior Member
 
Join Date: Feb 2015
Location: Alberta, Canada
Posts: 4,237
Thanks: 2,748
Thanked 3,592 Times in 1,282 Posts
Default

Thank you for that info Wilma. As always, it's very much appreciated!

Earl Haubrich was also kind enough to send me this picture (below) of his L78 4-speed tunnel last evening. Looks very original and completely unmolested. It shows the hole a couple inches ahead of the support brace which is where I thought it would be. My car didn't come with the original Nova shifter and everything in terms of the Ram Rod tunnel patch work was hastily performed.

Now that I have welded in and sealed up a metal patch, I'm waiting for this Hurst Super Shifter to arrive from Summit before I cut the opening to match. Being that it has no offset and a straight little stick, it should be close to the original hole location but likely smaller in diameter? I'm going to clean up and paint the underside of the tunnel today and will be ready to drop the engine and trans in tomorrow. I'll cut a new hole early next week when the rest of the parts arrive.

Here's Earl's car that he sent me reference pictures of. Thanks Earl.
__________________
I like solid lifter cars, big cams and cars w/ 3 pedals in them.
Reply With Quote
The Following 3 Users Say Thank You to NorCam For This Useful Post:
Damien (02-09-2019), ScottG (02-12-2019), YENKO DEUCE REGISTRY (02-13-2019)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 01:00 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.