Go Back   The Supercar Registry > General Discussion > Garages/shops..


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #23  
Old 01-12-2024, 11:26 PM
dannystarr dannystarr is offline
Senior Member
 
Join Date: Jan 2014
Posts: 511
Thanks: 0
Thanked 582 Times in 172 Posts
Default new shop progress

Got some things cleaned up. Ordered 17 tons of 3/4 crusher for the front of the shop for now. Spread by hand for about 5 hours. Then neighbor came over with baby John Deere and helped with the rest. So no mud for winter. Maybe concrete later.
Got a couple sheets of plywood cut. Hung them on screws. Used a clamp and the scissor lift to raise them up and set them on the screws at the correct height. Screwed them off. Set the mini split brackets and drilled the holes for the line sets and control wires. Hung both units.
Attached Images
     
Reply With Quote
The Following 3 Users Say Thank You to dannystarr For This Useful Post:
69M22Z (01-13-2024), dykstra (01-14-2024), olredalert (01-13-2024)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 06:50 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

O Garage vBulletin Plugins by Drive Thru Online, Inc.